Setting Up Gate Access for Home Renovation Projects

Home renovations mean lots of contractor traffic. Here's how to manage gate access without compromising security.

Home renovation projects bring a parade of contractors, delivery trucks, and service providers. Managing gate access during construction requires balancing convenience with security.

Contractor Access Options

Temporary Codes

  • Create unique codes for contractors
  • Set time-limited validity
  • Track who uses which code
  • Delete when project ends

Scheduled Open Periods

  • Gate held open during work hours
  • Closes automatically at set time
  • Reduces access management burden

Additional Remotes

  • Issue remotes to trusted contractors
  • Collect when project complete
  • Can be reprogrammed if lost

Security During Construction

Material Deliveries

  • Schedule deliveries with homeowner present
  • Use intercom for driver communication
  • Consider temporary camera monitoring

Subcontractor Management

  • General contractor responsible for subs
  • Limit who has independent access
  • Log entries when possible

Protecting Gate Equipment

Construction can damage gate systems:

  • Mark operator location clearly
  • Protect sensors from debris
  • Cover equipment during dusty work
  • Ensure trucks clear gate path

Heavy Equipment Considerations

  • Verify gate opening width for equipment
  • Check weight limits on driveway
  • Protect tracks from heavy loads
  • Consider temporary removal if needed

Post-Construction Reset

  1. Delete all temporary codes
  2. Reprogram or replace shared remotes
  3. Inspect equipment for damage
  4. Clean sensors and tracks
  5. Test full operation

Renovation Access Solutions

Standard Gate Co can set up temporary access solutions for your renovation. We'll help maintain security throughout your project. Call (323) 488-GATE.